Design Build
West
Oxford Avenue and
South
Platte River Bridge
| The
City of Sheridan, Colorado selected SEMA Construction and Bates
Engineering, Inc. as the design-build team for the $2,000,000 West
Oxford Avenue and South Platte River Bridge project. The two-span
217-foot long 54-inch prestressed concrete bulb tee girder bridge
was completed in January, 2000. |
 |
| The project widened Oxford Avenue from
2 to 4 lanes for about 1/4 mile. The project was constructed in
two phases in order to maintain traffic on West Oxford Avenue. |
Pinery
800,000 Gallon
Water Storage Tanks
 |
Bates Engineering
joined the design-build Western Summit Constructors, Inc., (a subsidiary
of The Industrial Company of Steamboat Springs, Colorado) team to
provide design and construction phase services for two 800,000 gallon
water storage tanks for the Pinery Water and Wastewater District
south of Parker, Colorado. |
| Construction of the circular post-tensioned concrete
tanks began in March and was completed in August, 1999. Both tanks
were built concurrently even though the tank sites are located approximately
5 miles apart. |
|