Rapid growth
in southeast Aurora, Colorado and the East Cherry Creek
Valley Water and Sanitation in the past three years has
created the need for additional supply, transmission and
storage facilities. In response to this need, the District
selected the design - build team of Grimm Construction
Co., Inc. and Bates Engineering, Inc. to design and construct
a second 10 million gallon tank at their site near the
E-470 / Smoky Hill Interchange.
Bates Engineering designed a 10 MG tank at the site in
1996 which was constructed in 1997. (Bob Bates also designed
a 5 MG tank at the site in 1980.)

9/17/01